Agenda item

PA/2021/369 Planning permission to erect a farm manager's dwelling at land to the rear of Hill Crest, East Lound Road, Owston Ferry (access from Burnham Road)

Minutes:

The Group Manager – Development Management and Building Control submitted a report for determination by the committee including summaries of policy context, representations arising from consultation and publicity and assessment of the applications.  The Head of Service updated the reports orally where appropriate.  Other officers attending gave advice and answered members’ questions as requested.

 

Prior to consideration of the item, the applicant addressed the committee.  He informed members that the application was made by a family business.  The business had to move due to the noise and smell emanating from the site.  Due to Government rules, a presence was required on site at all times to care for the animals.  As a result of theft, burglary and in order to care for the animals, 24-hour staffing was required to safeguard the site.  The business had employed five generations of the family but needed the application to be approved to ensure its long-term future.  The Parish Council were in support of the application.  The development was not contrary to policy LC14 as it had no adverse impact on the historical landscape.

 

Councillor C Sherwood was of the opinion that the application was in the open countryside and should be granted.

 

It was then moved by Councillor C Sherwood and seconded by Councillor Wells –

 

That planning permission be granted, subject to the following conditions –

 

1.

The development must be begun before the expiration of three years from the date of this permission.

 

Reason        

To comply with section 91 of the Town and Country Planning Act 1990.

 

2.

The development hereby permitted shall be carried out in accordance with the following approved plans: 005 Site Location Plan; 006 Existing Block Plan; 001 Ground and First Floor Plans; 002 Elevations as Proposed; 003 3D View 1; 3D View 2; Design and Access Statement.

 

Reason        

For the avoidance of doubt and in the interest of proper planning.

 

3.

Unless otherwise agreed by the local planning authority, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts 1 to 4 below have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the local planning authority in writing until part 4 has been complied with in relation to that contamination.

 

Part 1: Site Characteristics

A Phase 1 desk study shall be carried out to identify and evaluate all potential sources of contamination and the impacts on land and/or controlled waters, relevant to the site. The desk study shall establish a 'conceptual model' of the site and identify all plausible pollutant linkages. Furthermore, the assessment shall set objectives for intrusive site investigation works/Quantitative Risk Assessment (or state if none required). Two full copies of the desk study and a non-technical summary shall be submitted to the local planning authority for approval prior to proceeding to further site investigation.

 

An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the local planning authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the local planning authority. The report of the findings must include:

 

(i)             a survey of the extent, scale and nature of contamination;

(ii)            an assessment of the potential risks to:

- human health;

- property (existing or proposed), including buildings, crops, livestock, pets, woodland, and service lines and pipes;

- adjoining land;

- groundwaters and surface waters;

- ecological systems;

- archaeological sites and ancient monuments;

(iii)          an appraisal of remedial options, and a proposal of the preferred option(s).

This must be conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the management of Land Contamination, CLR 11'.

 

Part 2: Submission of Remediation Scheme

A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared and is subject to the approval in writing of the local planning authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation.

 

Part 3: Implementation of Approved Remediation Scheme

The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the local planning authority. The local planning authority must be given two weeks’ written notification of commencement of the remediation scheme works.

 

Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced and is subject to the approval in writing of the local planning authority.

 

Part 4: Reporting of Unexpected Contamination

In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the local planning authority. An investigation and risk assessment must be undertaken in accordance with the requirements of Part 1, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of Part 2, which is subject to the approval in writing of the local planning authority.

 

Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the local planning authority in accordance with Part 3.

 

Reason

To ensure that the risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to works, neighbours and other off-site receptors in accordance with policy DS7 of the North Lincolnshire Local Plan.

 

4.

The occupation of dwelling shall be limited to a person solely or mainly working, or last working, in the locality in agriculture, or a widow or widower or surviving civil partner of such a person, and to any resident dependants.

 

Reason

Permission is granted only after taking account of the particular personal circumstances involved and therefore as an exception to policies RD2 of the North Lincolnshire Local Plan and CS3 of the adopted Core Strategy.

 

5.

Notwithstanding the provisions of Classes A, B, C, D, E and G of Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) Order (2015), or any order re-enacting that order with or without modification, no extensions, buildings or enclosures shall be erected on the site or installed on the building other than those expressly authorised by this permission.

 

Reason

To protect the historic landscape in accordance with policies LC14 of the North Lincolnshire Local Plan and CS6 of the North Lincolnshire Core Strategy.

 

6.

No loose material shall be placed on any driveway or parking area within 10 metres of the adopted highway unless measures are taken to the satisfaction of the local planning authority to prevent the material from spilling onto the highway. Once agreed and implemented these measures shall be retained.

 

Reason

In the interests of highway safety and to comply with policy T19 of the North Lincolnshire Local Plan.

 

7.

Nothing shall at any time, whether permitted by the Town and Country Planning (General Permitted Development) Order or not, be erected, retained, planted or allowed to grow over 1.05 metres in height above the level of the adjoining carriageway for a distance of 2 metres from the highway boundary across the site frontage.

 

Reason

To ensure the provision/retention of adequate parking commensurate with the nature of the proposed development and to comply with policy T3 of the North Lincolnshire Local Plan.

 

8.

The dwelling shall not be occupied until the vehicular access to it and the vehicle parking and turning space(s) serving it have been completed and, once provided, the vehicle parking and turning space(s) shall be retained.

 

Reason

In the interests of highway safety and to comply with policies T2 and T19 of the North Lincolnshire Local Plan.

 

9.

No development shall take place until details showing an effective method of preventing surface water run-off from the highway onto the developed site have been submitted to and approved in writing by the local planning authority. These facilities shall be implemented prior to the access and parking facilities being brought into use and thereafter so retained.

 

Reason

To prevent the increased risk of flooding to themselves and others, to improve and protect water quality, and to ensure the implementation and future maintenance of the sustainable drainage structures in accordance with policy DS16 of the North Lincolnshire Local Plan, policies CS18 and CS19 of the North Lincolnshire Core Strategy, and paragraphs 155, 157, 163 and 165 of the National Planning Policy Framework.

 

10.

No development shall take place until details showing an effective method of preventing surface water run-off from hard paved areas within the site onto the highway have been approved in writing by the local planning authority. These facilities shall be implemented prior to the access and parking facilities being brought into use and thereafter so retained.

 

Reason

In the interests of highway safety and to comply with policy T19 of the North Lincolnshire Local Plan, policies CS18 and CS19 of the North Lincolnshire Core Strategy, and paragraph 163 of the National Planning Policy Framework.

 

11.

No above-ground works shall take place until details have been submitted to and approved in writing by the local planning authority of the make, type and colour of all external facing materials for the development and only the approved materials shall be used.

 

Reason

To ensure that the building is in keeping with its surroundings in the interests of visual amenity, in accordance with policy DS1 of the North Lincolnshire Local Plan.

 

12.

The dwelling shall not be occupied until details of the positions, design, materials and type of boundary treatment to be built/planted have been agreed in writing by the local planning authority. The agreed boundary treatment shall be built/planted before the dwelling is occupied and once built/planted it shall be retained.

 

Reason

To provide an appropriate level of screening in accordance with policy DS1 of the North Lincolnshire Local Plan.

 

13.

No development shall take place until the applicant, or their agents or successors in title, has secured the implementation of an archaeological mitigation strategy, to be defined in a Written Scheme of Investigation that has been submitted to, and approved in writing by, the local planning authority.  The strategy shall accord with a brief provided by North Lincolnshire Historic Environment Record and shall include details of the following:

 

(i)       measures to ensure the preservation by record of archaeological features of identified importance

 

(ii)       methodologies for the recording and recovery of archaeological remains, including artefacts and ecofacts

 

(iii)      post-fieldwork methodologies for assessment and analyses

 

(iv)      report content and arrangements for dissemination, and publication proposals

 

(v)      archive preparation and deposition with recognised repositories, including the digital archive with the ADS

 

(vi)      a timetable of works in relation to the proposed development, including sufficient notification and allowance of time to ensure that the site work is undertaken and completed in accordance with the strategy

 

(vii)     monitoring arrangements, including the notification in writing to the North Lincolnshire Historic Environment Record of the commencement of archaeological works and the opportunity to monitor such works

 

(viii)    a list of all staff involved in the implementation of the strategy, including sub-contractors and specialists, their responsibilities and qualifications.

 

Reason

To comply with paragraph 199 of the National Planning Policy Framework, policy CS6 of the Core Strategy and policy HE9 of the North Lincolnshire Local Plan because the site potentially contains archaeologically significant remains that the development would otherwise destroy; the archaeological mitigation strategy is required to preserve archaeological evidence by means of a comprehensive record and creation of a permanent archive, to advance public understanding. The archaeological mitigation strategy must be prepared and approved for implementation prior to the commencement of any groundwork within the application site that would otherwise result in destruction without record.

 

14.

The applicant shall notify the local planning authority in writing of the intention to commence the archaeological site works at least seven days before commencement. Thereafter, the archaeological mitigation strategy shall be carried out in accordance with the approved details and timings.

 

Reason

To comply paragraph 199 of the National Planning Policy Framework, policy CS6 of the Core Strategy and policy HE9 of the North Lincolnshire Local Plan because the site lies in an area of archaeological interest.

 

15.

A copy of any analysis, reporting, publication, or archiving required as part of the mitigation strategy shall be deposited at the North Lincolnshire Historic Environment Record and the archive at the North Lincolnshire Museum within six months of commencement of the archaeological programme of work or such other period as may be agreed in writing by the local planning authority.

 

Reason

To comply with paragraph 199 of the National Planning Policy Framework, policy CS6 of the Core Strategy and policy HE9 of the North Lincolnshire Local Plan because the site lies in an area of archaeological interest.

 

Informatives

 

1.

Our records indicate that the proposed development site is bounded by, or has running through it, a watercourse (surface water pipe/culvert or ditch). Following inspection, the watercourse may need to be cleared, replaced, protected or diverted by the landowner at their expense in accordance with their riparian responsibilities. An easement adjacent to the watercourse may need to be provided for future maintenance. Any other drainage feature found during excavations must be immediately reported to the LLFA Drainage Team on 01724 297522, prior to any further construction works being carried out.

 

2.

Our records indicate that the proposed development site is bounded by an ordinary/riparian watercourse/highway drain along the eastern boundary. The proposals show a new access to be provided over and/or connection into the watercourse. This must be consented by North Lincolnshire Council’s LLFA Drainage Team, in their capacity as Lead Local Flood Authority, and/or the local Internal Drainage Board through an Ordinary Watercourse Consent and appropriate discharge rates must be agreed. Please contact the LLFA Drainage team on 01724 297522 or by email to llfadrainageteam@northlincs.gov.uk for further details. Compliance with this guidance is to ensure the free flow of surface water is maintained throughout the development.

 

3.

The development hereby granted planning permission requires works to be carried out within the limits of the adopted (public) highway. Therefore:

 

- before ANY construction works take place within the limits of the highway you MUST contact the highway authority on telephone number 01724 297000 to arrange for the relevant permissions/licenses to be issued;

 

- before ANY service (utility) connections take place within the limits of the highway you MUST contact the highway authority on telephone number 01724 297319 to arrange for the relevant permissions/licenses to be issued.

 

4.

In determining this application, the council, as local planning authority, has taken account of the guidance in paragraph 38 of the National Planning Policy Framework in order to seek to secure sustainable development that improves the economic, social and environmental conditions of the area.

 

Motion Carried